SSC CPO Scheduling / Day-Month Puzzle — Study Material & 20 Practice MCQs | ZestExam
ZestExam
SSC CPO Scheduling / Day-Month Puzzle
Study Material · Concept Notes · Shortcuts
This page covers SSC CPO Scheduling / Day-Month Puzzle with complete concept notes, 20 graded practice MCQs, key points and exam-specific tips. Free to study.
Every puzzle has conditions that must be satisfied. Read all conditions first. Look for direct clues (like 'A meets on Monday') and indirect clues (like 'B meets two days after C'). Use elimination method to narrow down possibilities
→Three Main Types
1) Day-wise scheduling (7 days of week), 2) Month-wise scheduling (12 months), 3) Date-wise scheduling (1-31 dates). Each type follows similar solving patterns but has different reference points
🔑Formula for Gap Calculation
If X meets 'n' days after Y, and Y is on day 'd', then X is on day 'd+n'. For circular arrangements (like days of week), use modulo 7. If result exceeds 7, subtract 7.
📊
Exam Patterns
What examiners ask — read before attempting PYQs
⚡Powerful Shortcut
Create a possibility chart. List all people vertically and all days/months horizontally. Mark 'YES' for confirmed positions and 'NO' for impossible ones. This visual method prevents confusion and speeds up solving
✏️Worked Example 1
Six friends A, B, C, D, E, F meet on different days of the week starting Monday
→Conditions
1
Place direct clues. B = Wednesday, E = Sunday (last day).
2
F meets immediately before B, so F = Tuesday.
3
From condition 1, if C = Monday, then A = Wednesday. But B is already on Wednesday. So C cannot be Monday.
4
If C = Thursday, then A = Saturday
🔑Check condition 3
D must be between C and A, so D = Friday. This works!
Step 5: Remaining person goes to remaining day. So the arrangement is: Monday = (remaining), Tuesday = F, Wednesday = B, Thursday = C, Friday = D, Saturday = A, Sunday = E
✏️Worked Example 2
1
P = April (given).
2
Since S meets immediately after R, and S meets in a 30-day month, possible months for S are April, June, September, November.
3
S cannot be April (P is there). If S = June, then R = May
🔑Check
Q meets two months before R means Q = March. This works!
Step 4: Final arrangement: Q = March, P = April, R = May, S = June.
Top
⚡
Shortcuts
Use these to save 30–60 seconds per question
⚠️Most Common Mistake
Students confuse 'after' and 'before'. If A meets 2 days after B, it means A's day comes later than B's day. Many students reverse this relationship. Always draw a timeline to avoid confusion.
Another frequent error is miscounting gaps. 'Two days after Monday' means Wednesday, not Tuesday
→Count carefully
Monday (start) → Tuesday (1 day after) → Wednesday (2 days after).
Test Scheduling / Day-Month Puzzle under exam conditions
Five friends—Arun, Bhavna, Chetan, Deepa, and Eira—are scheduled to present on five consecutive days: Monday to Friday. Each person presents exactly once. Based on the following clues, who presents on Wednesday?
1. Arun presents two days before Chetan.
2. Bhavna presents on Friday.
3. Deepa presents on Monday.
4. Eira presents one day after Arun.
Who presents on Wednesday?
Practice 2easy
Four tasks—P, Q, R, S—must be completed on four different days of the same week: Monday, Tuesday, Wednesday, Thursday. Each task is done exactly once. Consider the clues:
1. Task R is completed on Wednesday.
2. Task P is completed one day before Task Q.
3. Task S is completed on Thursday.
On which day is Task Q completed?
Practice 3easy
Four tasks—A, B, C, D—must be completed on four consecutive days: Day 1 to Day 4. The following conditions apply:
1. Task A is completed before Task C.
2. Task B is completed on Day 2.
3. Task D is completed on Day 4.
4. Task C is not completed on Day 1.
On which day is Task A completed?
Practice 4easy
Four friends—Priya, Qasim, Ravi, and Sana—are born in four different months: February, May, August, and November. Based on the clues below, in which month is Ravi born?
Clue 1: Priya is born in February.
Clue 2: Qasim is born in a month that comes before August.
Clue 3: Sana is born in November.
Clue 4: Ravi is born in a month that comes after May.
Practice 5easy
Six events—A, B, C, D, E, and F—are scheduled on six consecutive days: Monday through Saturday. Each event occurs exactly once. Based on the clues below, which event is scheduled on Friday?
Clue 1: Event A is scheduled on Monday.
Clue 2: Event C is scheduled exactly two days after Event B.
Clue 3: Event E is scheduled on Saturday.
Clue 4: Event D is scheduled on Wednesday.
Practice 6easy
Six friends — A, B, C, D, E, and F — each have a birthday in a different month: January, February, March, April, May, and June (not necessarily in that order). A's birthday is in April. B's birthday is two months after A's. C's birthday is in January. D's birthday is one month before C's — but since there is no month before January in this list, D's birthday is in February. E's birthday is in March. Which month is F's birthday in?
Practice 7easy
Five friends—Aman, Bhavna, Chetan, Deepa, and Esha—are scheduled to give presentations on five consecutive days: Monday to Friday. The following conditions apply:
1. Aman presents on Wednesday.
2. Bhavna presents the day after Chetan.
3. Deepa does not present on Monday or Friday.
4. Esha presents on Friday.
On which day does Bhavna present?
Practice 8easy
A project has four milestones scheduled across four months: January, February, March, and April. Each milestone is assigned to exactly one month. The milestones are: Design, Development, Testing, and Deployment. Based on the clues below, in which month is Testing scheduled?
Clue 1: Design is scheduled before Development.
Clue 2: Testing is scheduled after Development.
Clue 3: Deployment is scheduled in April.
Clue 4: Development is not scheduled in January.
Practice 9easy
Six events—P, Q, R, S, T, U—are scheduled over six months: January to June. The following conditions apply:
1. Event P is in January.
2. Event Q is exactly two months after Event R.
3. Event S is not in January, February, or June.
4. Event T is in May.
5. Event U is in June.
In which month is Event R scheduled?
Practice 10medium
Five employees—Aman, Bhavna, Chitra, Deepak, and Esha—are scheduled for meetings on five consecutive days: Monday through Friday. Each person meets exactly once. Based on the following clues, who meets on Wednesday?
1. Aman meets on Monday or Tuesday.
2. Bhavna meets exactly two days after Chitra.
3. Deepak does not meet on Friday.
4. Esha meets on Thursday or Friday.
5. Chitra does not meet on Monday.
Practice 11medium
Five doctors—Vikram, Wanda, Xavier, Yuki, Zara—have appointments on five consecutive days: Monday to Friday. Each doctor has exactly one appointment. Using the clues, who has an appointment on Wednesday?
1. Vikram's appointment is on Monday or Tuesday.
2. Wanda's appointment is exactly one day after Xavier's.
3. Yuki's appointment is not on Friday.
4. Zara's appointment is on Thursday or Friday.
5. Xavier's appointment is not on Monday.
Practice 12medium
Four friends—Priya, Qasim, Ravi, and Sana—plan to visit four cities—Delhi, Goa, Hyderabad, and Jaipur—on four consecutive days: Day 1, Day 2, Day 3, and Day 4. Each friend visits exactly one city on exactly one day. Based on the clues below, on which day does Ravi visit Hyderabad?
1. Priya visits Delhi on Day 1.
2. Qasim visits Goa on Day 2.
3. Sana visits Jaipur, and this visit occurs after Ravi's visit to Hyderabad.
4. Ravi does not visit on Day 1 or Day 2.
Practice 13medium
Five projects—P1, P2, P3, P4, P5—are scheduled across five months: January, February, March, April, and May. Each project is assigned to exactly one month. Based on the clues below, in which month is project P3 scheduled?
1. Project P1 is scheduled in January.
2. Project P4 is scheduled in May.
3. Project P2 is scheduled exactly one month before project P5.
4. Project P3 is scheduled after project P2 but before project P5.
Practice 14medium
Six events—P, Q, R, S, T, U—are scheduled across six months: January through June. Each event occurs in exactly one month. Using the clues below, in which month is event R scheduled?
1. Event P occurs in January.
2. Event Q occurs exactly two months after event T.
3. Event S occurs in June.
4. Event U occurs in March.
5. Event R occurs before event Q.
Practice 15medium
Five employees—Arun, Bhavna, Chitra, Deepak, and Esha—are scheduled to work on five consecutive days: Monday through Friday. Each works exactly one day. Based on the following clues, on which day does Chitra work?
1. Arun works on Wednesday.
2. Bhavna works the day immediately before Deepak.
3. Esha works on Friday.
4. Chitra does not work on Monday or Tuesday.
Practice 16medium
Seven tasks—A, B, C, D, E, F, G—are assigned to seven days of a week (Monday through Sunday). Each task is assigned to exactly one day. Based on the following clues, on which day is task E assigned?
1. Task A is assigned on Monday.
2. Task C is assigned on Friday.
3. Task B is assigned exactly two days after task D.
4. Task G is assigned on Sunday.
5. Task E is assigned before task F.
Practice 17medium
Six tasks—P, Q, R, S, T, U—must be completed on six consecutive days: Monday to Saturday. Each task is assigned to exactly one day. Using the clues below, which task is scheduled for Thursday?
1. Task P is scheduled before Task Q.
2. Task R is scheduled exactly three days before Task T.
3. Task S is scheduled on Tuesday or Wednesday.
4. Task U is scheduled on Friday or Saturday.
5. Task Q is not scheduled on Saturday.
Practice 18medium
Six events—Event 1, Event 2, Event 3, Event 4, Event 5, Event 6—are scheduled over six consecutive days: Monday to Saturday. Each event occurs exactly once per day. Based on the following clues, which event is scheduled for Friday?
1. Event 1 is scheduled on Monday.
2. Event 3 is scheduled exactly two days after Event 2.
3. Event 4 is scheduled on Tuesday or Wednesday.
4. Event 5 is scheduled on Thursday or Friday.
5. Event 6 is not scheduled on Saturday.
Practice 19medium
Seven meetings—A, B, C, D, E, F, G—are scheduled across seven days: Monday to Sunday. Each meeting occurs exactly once. Determine which meeting is on Saturday using these clues:
1. Meeting A is on Monday.
2. Meeting C is exactly two days after Meeting B.
3. Meeting E is on Wednesday or Thursday.
4. Meeting F is on Friday or Saturday.
5. Meeting D is not on Sunday.
6. Meeting G is on Sunday.
Practice 20hard
Six employees—Anil, Bhavna, Chitra, Deepak, Esha, and Farhan—are scheduled to work shifts across three days (Monday, Tuesday, Wednesday), with exactly two employees per day. The following constraints apply:
1. Anil works on Monday or Tuesday, but not Wednesday.
2. Bhavna works the day immediately after Chitra (if Chitra works on Monday, Bhavna works on Tuesday; if Chitra works on Tuesday, Bhavna works on Wednesday).
3. Deepak and Esha do not work on the same day.
4. Farhan works on Wednesday.
5. If Anil works on Monday, then Deepak works on Tuesday.
6. Chitra does not work on Wednesday.
Who works with Farhan on Wednesday?